Project infomation

  • Employer: Petro Viet nam (PVN)
  • Client: PTSC power/ PTSC Thanh Hoa
  • Scope of work: installation of ESP
  • Location: Long Phu, Soc Trang
  • Time: 10/2017 to 1/2019